Purchased a set of Carbon Fiber Cranks 165 Q:8 Isis Standard (Black) for E-BIKE
What's included: Right and left crank arms, installation bolts
mirandabikestore.com
Purchased a 18-8 Stainless Steel Round Shim, 1.5mm Thick, 22mm ID to offset the left side crank arm (otherwise it interferes with the Bafang m620 motor case)
McMaster-Carr is the complete source for your plant with over 595,000 products. 98% of products ordered ship from stock and deliver same or next day.
www.mcmaster.com
Purchased a set of PNW Components Range Composite Pedals
Purchased a 46T aluminum chainring with integrated guard
Detached the spider from the chainring supplied with the Innotrace X1 motor
Attached the 46T chainring to the spider
Attached the spider with the chainring to the motor with the hardware supplied with the Innotrace X1 motor
Attached the 1.5mm shim to the left crank arm interface on the motor
Lubed the crank arms to motor interfaces with an assembly lube
Attached the crank arms
Attached the washers supplied with the pedals to the padals
Attached the pedals to the crank arms
Connected the battery leads from the battery lower mount, the electrical harness and the speed sensor to the motor
Secured the unused motor connectors wits electrical tape so it has low profile and does nto interfere with another cables and connectors
Attached the motor to the frame making sure the cables are free
Attached the 3 motor fasteners supplied with the Innotrace X1 motor
Attached the motor plastic shroud supplied with the Innotrace X1 motor and the screws supplied with the frame
There were no washers for the screws in the frame kit so I found 3 M3 washed with 7mm outside diameter
Attached the moor shroud to the frame
There is a M3x8mm countersink screw necessary to attach the motor bottom cover to the motor and I did not find such screw in my frame kit so I found one in another place
Attached the motor bottom cover to the frame and to the motor with 2 screws supplied with the frame and one M3x8mm countersink screw I got from different place