Miles versus times charge

jaggysnake

Active member
Joined
Jul 5, 2019
Messages
166
Reaction score
110
Location
uk
According to MC app mine has been charged 20 times and I've done 932.03 miles on it

Turbo levo comp carbon

46.6 miles per charged

Whats yours saying
 
⚡ EMTB Pro Go Pro — exclusive discounts & ad-free Peaty's 25% off & more · Ad-free browsing · Pro badge See the deals →
500wh do a lot of commuting but trails as well some hilly, been to top snowdon on it
 
OK - I'd say those are good numbers tho I guess if a lot are flatter road miles that will help. Battery use is impacted harder by climbing than mileage I think.

Early days for me but I've got 6 charge cycles on 345km = 57.5km/cycle. 500 Wh battery. But my rides are hilly and I often don't hold the horses on the climbs.
 
After about 1000 miles I seem to be at average 30 miles per charge
I’m happy with that , I’m about 18 and a half stone
 
What counts as one charge? I usually charge my batteries to 80% and then charge to 100% the same day as am going biking. Is that being recorded as 2 charges?
 
What counts as one charge? I usually charge my batteries to 80% and then charge to 100% the same day as am going biking. Is that being recorded as 2 charges?
I believe it only counts 100% has one, so if you charged from 50 to 100 twice that would count has 1 charge cycle
 
As soon as the sum of the charge current power has reached the capacity of the battery, this is calculated as one charge cycle - regardless of how many parts have been charged.
 
As soon as the sum of the charge current power has reached the capacity of the battery, this is calculated as one charge cycle - regardless of how many parts have been charged.
Thanks for clearing up that.
 
2019 levo comp 500 wh
794 miles / 17 charges = 46.7
Fair amount of flat riding to trails or just cruising around. 35,000 feet elevation gain per Strava.

On a side note, chain wear using my park tool cc-3.2 stamped steel jobby is rubbing at .5. Mostly dry conditions (purchased end of rainy season here in SF bay area Cali USA).
How's that compare to others? Time for a new chain?
 
I think you are reading battery history.
You can plug to charge 100 or 500 times that makes no difference.
What is being counted are units. Let say the battery is 500Wh that just keeps totaling the Wh that have been added. So 10 charges is 5000Wh have been added in 10 times or more. So we can mention on average i ride 1kilometer when i use x Wh many are about 7 so about 70Km/charge if the battery is 500Wh but it varies a lot depending on surface, tires, etc.. ... I have no clue how to read mine, sorry.
 
500wh do a lot of commuting but trails as well some hilly, been to top snowdon on it
Hi Sorry to jump this thread but noticed you have taken your levo to top of snowdon, can you tell me which route and how long it took going up and down? Thanks Joe
 
Keep reading
    Browse all

    Similar Threads

    Community Stats

    Since 2018
    670K
    Messages
    41,029
    Members
    Join 30,000+ Riders, it's free!
    Back
    Top